skip to main content
Heartland Community College

Agriculture Facility

Updates

Electrical switch gear will be updated in the spring. Updates forthcoming to integrate photovoltaic system to electrical infrastructure. Walkway and sidewalk finishing in spring. The existing water main pipelines will be connected from Ag Complex to the Main Campus loop near the EVL between May and August of 2024. Parking Lots C &F will be closed during part of this construction.

Building is open and systems are operating.

Timeline

The Ag Complex opened for classes on January 16, 2024. 

 

About the Facility

Birds-eye view rendering of the Agriculture Complex. 29,500 square foot facility.

Learning Space For:

  • plant science
  • soil analysis
  • precision planting technology
  • drone technology 
  • heavy equipment
  • agribusiness and more